The main core activity of NLC is Lignite Excavation and
power generation using lignite excavated. NLC is having three lignite
mines named as Mine I, Mine II and Mine IA. Also raw lignite is being
sold to small scale industries to use it as fuel in their production
activities.
|
MINES
|
CAPACITY OF MINES
|
| MINE I |
10.5 MT / A |
| MINE I A |
3 MT / A |
| MINE II |
10.5 MT / A |
NLC is generating power in its Thermal Power Station I, Thermal Power
Station -II and in Thermal Power Station I Expansion. All the southern
states are beneficiaries of this power generation project.
|
THERMAL POWER STATION I
Power Generation : 600 MW
(
6 * 50 MW + 3 * 100 MW) in 9 units
Power Allocation :
|
ALLOTED TO
|
%
|
| TNEB Export |
79%
|
| Station Consumption |
12%
|
|
NLC schemes
(Mines, Township & others)
|
9%
|
THERMAL POWER STATION I Expansion
Power Generation : 420 MW
(
2 * 210 MW ) in 2 units
Power Allocation :
|
ALLOTED TO
|
ACTUAL
|
| KPTCL |
22.00
|
| KSEB |
14.00 |
| TNEB |
46.00 |
| PONDY |
3.00 |
| Unallocated power |
15.00 |
|
THERMAL POWER STATION II
Power Generation : 1470 MW
(
7 * 210 MW ) in 7 units
Power Allocation :
|
ALLOTED TO
|
%
|
ACTUAL
|
| Andhra Pradesh |
19
|
277 MW
|
| Karnataka |
14
|
199 MW
|
| Kerala |
10
|
153 MW
|
| Tamil Nadu |
30
|
441 MW
|
| Pondicherry |
5
|
80 MW
|
| NLC (Aux & Internal consumption) |
7
|
100 MW
|
| Unallocated share |
15
|
220 MW
|
|
|